Dist. | County | Route | Section | Begin Mile Marker | End Mile Marker | Lane(s) Closed | Begin Date | Approx. Days | Time | Hor. Clr. | Unit | Vert. Clr. | Max. Width Load | Comments................ |
2 | Desha | 4 | 170 | 7.30 | 10.13 | Alternating East & West Bound | 01/31/2018 | Ongoing | 24 Hours | 12.00 | FT | | 11.00 | Width Restriction - All Lanes. Alternating lane closures. Job 020622 |
6 | Saline | 9 | 050 | 0.00 | 17.47 | Alternating North & South Bound | 10/01/2018 | Ongoing | 24 hours | 10.00 | FT | 14.00 | 10.00 | Job 061561- Shoulder/lane widening NB |
8 | Conway | 9 | 070 | 5.33 | 5.69 | Alternating North & South Bound | 02/25/2019 | 2 | 9am-3pm | 14.00 | FT | | 11.00 | Bridge Inspection by HBM |
6 | Pulaski | 10 | 080 | 6.70 | 7.20 | East Bound Outside | 11/27/2018 | ongoing | 8 P.M. - 6 A.M. | | FT | | 11.00 | 061331 Subsurface Investigations for project. |
6 | Pulaski | 10 | 080 | 7.10 | 7.80 | West Bound Outside | 11/27/2018 | ongoing | 8 P.M. - 6 A.M. | | FT | | 11.00 | 061331 Subsurface Investigations for project. |
9 | Madison | 16 | 050 | 5.26 | 5.31 | Alternating East & West Bound | 10/16/2018 | Ongoing | 24 Hours | 9.00 | FT | | 11.00 | Width Restriction - All Lanes. |
4 | Scott | 28 | 010 | 0.00 | 15.88 | Alternating East & West Bound | 09/12/2018 | On Going | 7 am to 6 pm | 11.00 | FT | | 8.00 | Asphalt Paving Operation and dirt work operations to widen roadway, Project R40104. |
3 | Hempstead | 30 | 120 | 35.00 | 40.10 | All | 02/10/2019 | Ongoing | 24 hours | | FT | 14.50 | | Job BB1101, Reduce vertical clearance to 14.5 feet for overpass rehab. |
3 | Hempstead | 30 | 120 | 35.00 | 40.10 | East & West Bound | 02/22/2019 | Ongoing | 24 Hours | 14.00 | FT | | 11.00 | Job BB1101, alternating inside and outside closures |
3 | Nevada | 30 | 130 | 40.16 | 53.15 | East & West Bound | 02/22/2019 | Ongoing | 24 Hours | 14.00 | FT | | 11.00 | Job BB1101, alternating inside and outside lane closures |
Dist. | County | Route | Section | Begin Mile Marker | End Mile Marker | Lane(s) Closed | Begin Date | Approx. Days | Time | Hor. Clr. | Unit | Vert. Clr. | Max. Width Load | Comments................ |
3 | Nevada | 30 | 130 | 40.16 | 47.00 | All | 02/10/2019 | Ongoing | 24 hours | | FT | 14.50 | | Job BB1101, Reduce vertical clearance to 14.5 feet for overpass rehab. |
3 | Nevada | 30 | 130 | 52.93 | 53.08 | West Bound Outside | 02/25/2019 | 2 | 8am-3pm | 16.00 | FT | | 13.00 | Width Restriction. Drift Removal. |
7 | Clark | 30 | 140 | 53.15 | 53.92 | West Bound Outside | 02/25/2019 | 2 | 8 a.m. - 3 p.m. | 16.00 | FT | | 13.00 | Width Restriction. Drift Removal. |
7 | Clark | 30 | 140 | 53.15 | 57.00 | East & West Bound | 02/26/2019 | Ongoing | 8 pm - 10 am | 14.00 | FT | | 11.00 | Alternating inside and outside lanes. |
4 | Crawford | 40 | 110 | 10.00 | 16.00 | Right Shoulder | 12/03/2018 | Ongoing | 24 | 18.00 | FT | | 18.00 | Shoulder work Job 012215 |
4 | Crawford | 40 | 110 | 11.00 | 13.00 | Alternating East & West Bound | 02/05/2019 | 20 | 24 | 12.00 | FT | | 12.00 | Paving operations under Job 012285 |
8 | Johnson | 40 | 210 | 62.00 | 62.75 | West Bound Outside | 02/25/2019 | 4 | 7;00am-5:30pm | 13.00 | FT | | 10.00 | HBM Crews Bridge repairs. |
8 | Pope | 40 | 220 | 94.50 | 95.00 | East Bound Outside | 02/25/2019 | 1 | 7a - 5p | | FT | | 12.00 | Asphalt Paving Operation. |
8 | Pope | 40 | 220 | 95.70 | 95.80 | East Bound Inside | 02/27/2019 | 1 | 7a - 5p | | FT | | 12.00 | Asphalt Paving Operation. |
8 | Pope | 40 | 220 | 95.70 | 95.80 | East Bound Outside | 02/26/2019 | 1 | 7a - 5p | | FT | | 12.00 | Asphalt Paving Operation. |
Dist. | County | Route | Section | Begin Mile Marker | End Mile Marker | Lane(s) Closed | Begin Date | Approx. Days | Time | Hor. Clr. | Unit | Vert. Clr. | Max. Width Load | Comments................ |
8 | Pope | 40 | 220 | 96.00 | 96.40 | East Bound Outside | 02/28/2019 | 1 | 7a - 5p | | FT | | 12.00 | Asphalt Paving Operation. |
6 | Prairie | 40 | 420 | 199.00 | 202.00 | West Bound Outside | 04/10/2017 | Ongoing | 24 Hours | | FT | | 20.00 | Job BB0610 Concrete Barrier Wall installed on right shoulder |
6 | Prairie | 40 | 420 | 200.00 | 202.00 | East Bound Outside | 04/24/2017 | Ongoing | 24 Hours | | FT | | 20.00 | Job BB0610 Concrete Barrier Wall installed on right shoulder |
1 | St.-Francis | 40 | 510 | 248.00 | 249.00 | Alternating East & West Bound | 06/07/2016 | Ongoing | 7 p.m. - 9 a.m. | 12.00 | FT | | 11.00 | Job BB0112 - Access to median |
1 | St.-Francis | 40 | 510 | 248.10 | 264.57 | West Bound Outside | 03/29/2018 | Ongoing | 7:00 p.m. to 8:00 a.m. | 14.00 | FT | | 11.00 | BB0116 - Punch List work |
1 | St.-Francis | 40 | 510 | 248.10 | 264.57 | East Bound Outside | 05/08/2018 | Ongoing | 8:00 p.m. to 9:00 a.m. | 14.00 | FT | | 11.00 | BB0116 - Punch List work |
1 | Crittenden | 40 | 520 | 264.57 | 274.00 | Alternating East & West Bound | 05/02/2016 | Ongoing | 8:00 p.m. to 8:00 a.m. | 14.00 | FT | | 11.00 | 4 miles lane closures for paving/ditch paving - BB0107. |
4 | Crawford | 49 | 270 | 19.50 | 22.50 | North & South Bound | 01/03/2019 | 56 | 6:00am - 8:00pm | 12.00 | FT | | 12.00 | Shoulder work under job 012215 |
4 | Washington | 49 | 280 | 72.00 | 74.19 | North & South Bound | 02/11/2019 | 15 | 10:00pm - 6:00am | 12.00 | FT | | 12.00 | PLACING BARRIER WALL JOB 012215 |
9 | Benton | 49 | 290 | 85.25 | 86.75 | South Bound Off Ramp | 02/15/2019 | Ongoing | 24 Hours | | FT | | 0.00 | 090376 - Closing both ramps (Hwy. 62/102) beginning at 9 PM. |
Dist. | County | Route | Section | Begin Mile Marker | End Mile Marker | Lane(s) Closed | Begin Date | Approx. Days | Time | Hor. Clr. | Unit | Vert. Clr. | Max. Width Load | Comments................ |
9 | Benton | 49 | 290 | 85.25 | 87.25 | North Bound On Ramp | 02/15/2019 | Ongoing | 24 Hours | | FT | | 0.00 | 090376 - Closing both ramps (Hwy. 62/102) beginning at 9 PM. |
9 | Benton | 49 | 290 | 86.09 | 87.45 | Alternating North & South Bound | 01/14/2019 | 47 | 9PM-6AM | | FT | | 12.00 | 090376 - Painting bridge. Excluding Sundays. |
4 | Washington | 59 | 040 | 14.94 | 16.08 | Alternating North & South Bound | 02/06/2018 | On | 24 Hours | 11.00 | FT | | 8.50 | Slide repair alternating lane closures north and south bound Project 040750. |
9 | Carroll | 62 | 050 | 12.05 | 15.78 | Alternating East & West Bound | 01/30/2017 | Ongoing | 6:00 am - 6:00 pm | 12.00 | FT | | 9.00 | Width Restriction - All lanes on project 090230. |
10 | Lawrence | 62 | 180 | 0.00 | 0.30 | Alternating East & West Bound | 02/26/2019 | 3 | 7:00am-5:30pm | 12.00 | FT | | 10.00 | Bridge repairs. Hbm Crews |
5 | Sharp | 63 | 020 | 2.79 | 3.10 | Width Restriction Only | 12/22/2017 | Ongoing | 24 | 11.00 | FT | | 9.00 | Width Restriction - All Lanes. Bridge Construction Job 050275 |
5 | Sharp | 63 | 020 | 5.40 | 5.60 | Width Restriction Only | 07/31/2017 | Ongoing | 24 Hours | 12.00 | FT | | 9.00 | Width Restriction - All Lanes. Temporary Bridge Structure - Job 050275 |
4 | Crawford | 64 | 020 | 6.00 | 8.00 | Alternating East & West Bound | 02/25/2019 | 4 | 8:00 A.M. - 4:30 PM | | FT | | 14.00 | Bridge Inspection. |
8 | Faulkner | 64 | 090 | 17.93 | 20.03 | Alternating East & West Bound | 09/22/2016 | Ongoing | 24 hrs. | 12.00 | FT | | 11.00 | Notch and widening highway for Job 012155 |
9 | Boone | 65 | 020 | 6.12 | 10.49 | Alternating North & South Bound | 11/13/2017 | Ongoing | 6:00 am - 6:00 pm | 13.00 | FT | | 10.00 | Width Restriction - All Lanes for Project CA0906. |
Dist. | County | Route | Section | Begin Mile Marker | End Mile Marker | Lane(s) Closed | Begin Date | Approx. Days | Time | Hor. Clr. | Unit | Vert. Clr. | Max. Width Load | Comments................ |
8 | Van-Buren | 65 | 080 | 3.02 | 7.00 | North & South Bound | 06/25/2018 | Ongoing | 24 Hours | | FT | | 12.00 | Lane restrictions due to construction project 080423 through RE84 Office. |
8 | Van-Buren | 65 | 080 | 3.02 | 7.02 | North & South Bound | 06/23/2018 | Ongoing | 24 Hours | | FT | | 12.00 | Width restriction in N.B. and S.B. Lane in conjunction with Job 080423 (RE 84 Office). |
6 | Pulaski | 67 | 100 | 11.24 | 15.34 | North Bound Outside | 04/04/2017 | Ongoing | 8:00 P.M. - 1:00 P.M. | | FT | 16.00 | 8.50 | Job CA0605 - Northbound lane restriction |
6 | Pulaski | 67 | 100 | 11.24 | 15.34 | South Bound Outside | 04/04/2017 | Ongoing | 7:00 P.M. - 6:00 A.M. | | FT | 16.00 | 8.50 | CA0605 - Southbound Lane Restriction - Pulaski County |
6 | Lonoke | 67 | 110 | 0.00 | 0.54 | North Bound Outside | 04/04/2017 | Ongoing | 8:00 P.M. - 1:00 P.M. | | FT | | 8.50 | Job CA0605 - Northbound lane restriction - Lonoke County |
6 | Lonoke | 67 | 110 | 0.00 | 0.54 | South Bound Outside | 04/04/2017 | Ongoing | 7:00 P.M. - 6:00 A.M. | | FT | | 8.50 | CA0605 - Southbound Lane Restriction - Lonoke County |
10 | Randolph | 67 | 180 | 7.07 | 7.75 | Width Restriction Only | 01/11/2019 | Ongoing | 24 Hours | 13.00 | FT | | 12.00 | Width Restriction - South Bound Lane has more width than NB |
10 | Randolph | 67 | 180 | 7.07 | 7.75 | Width Restriction Only | 01/11/2019 | Ongoing | 24 | 12.00 | FT | | 11.00 | Width Restriction - Northbound Lanes Only more width on SB side |
5 | Izard | 69 | 01B | 1.42 | 1.46 | All | 02/12/2019 | Ongoing | 24 Hours | | FT | | | Box Culvert work. ARDOT Job 050323 |
5 | Independence | 69 | 02B | 2.05 | 2.25 | West Bound | 02/11/2019 | On going | 5:00pm - 8:00am | 12.00 | FT | | 8.00 | Box Culvert work. |
Dist. | County | Route | Section | Begin Mile Marker | End Mile Marker | Lane(s) Closed | Begin Date | Approx. Days | Time | Hor. Clr. | Unit | Vert. Clr. | Max. Width Load | Comments................ |
5 | Independence | 69 | 02B | 2.05 | 2.25 | All | 02/11/2019 | On Going | 8:00am - 5:00pm | 12.00 | FT | | 8.00 | Box Culvert work. |
4 | Washington | 71 | 17B | 3.20 | 3.50 | North Bound | 02/20/2019 | 2 | 8:00 PM - 6:00 AM | 12.00 | FT | | 9.00 | Both NB lanes and center turn lane will be closed for sewer main installation. |
9 | Benton | 71 | 18B | 10.80 | 11.80 | North & South Bound | 11/03/2018 | Ongoing | 24 Hours | | FT | 14.00 | 24.00 | BB0903 Not for lane closure - Reduced Vertical Clearance |
9 | Benton | 71 | 19B | 0.00 | 1.00 | North & South Bound | 11/03/2018 | Ongoing | 24 Hours | | FT | 14.00 | 24.00 | BB0903 Not for lane closure - Reduced Vetical Clearance |
9 | Newton | 74 | 050 | 3.62 | 12.26 | Alternating East & West Bound | 02/07/2019 | Ongiong | 24 Hours | 9.00 | FT | | 11.00 | Width Restriction - All Lanes. |
9 | Newton | 74 | 050 | 11.74 | 11.86 | Alternating East & West Bound | 10/16/2018 | Ongoing | 24 Hours | 9.00 | FT | | 11.00 | Width Restriction - All Lanes. |
7 | Columbia | 82 | 040 | 2.24 | 4.30 | All | 07/03/2017 | Ongoing | 24 hours | 10.00 | FT | 20.00 | 10.00 | Both Shoulders closed with Traffic Drums and Vertical Panels. Narrow Roadway Width |
2 | Ashley | 82 | 080 | 16.00 | 17.25 | Right Shoulder | 11/14/2017 | Ongoing | 24 hours | 12.00 | FT | | 11.00 | Width Restriction - All Lanes. Alternating Shoulder Closures. Job 020534 |
9 | Benton | 102 | 030 | 0.00 | 0.50 | Alternating East & West Bound | 02/06/2019 | 24 | 9PM-6AM | | FT | | 12.00 | Striping/Pavement Marking Placement. Excluding Sundays. |
8 | Johnson | 103 | 010 | 0.00 | 0.60 | North & South Bound | 08/07/2013 | ongoing | 24 Hours | 11.00 | FT | | 11.00 | Width Restriction - All Lanes. Installation of Centerline Islands with Light Poles |
Dist. | County | Route | Section | Begin Mile Marker | End Mile Marker | Lane(s) Closed | Begin Date | Approx. Days | Time | Hor. Clr. | Unit | Vert. Clr. | Max. Width Load | Comments................ |
4 | Washington | 112 | 00S | 0.00 | 0.25 | West Bound Outside | 01/08/2019 | 60 | 9 AM - 3 PM | 12.00 | FT | | 9.00 | Sidewalk contruction along the back of curb. |
7 | Union | 167 | 020 | 0.30 | 3.80 | Width Restriction Only | 12/14/2016 | Ongoing | 24 hours | 12.00 | FT | | 9.00 | ACHM leveling closed shoulders at various locations. |
7 | Union | 167 | 020 | 4.20 | 4.90 | Width Restriction Only | 12/14/2016 | Ongoing | 24 hours | 12.00 | FT | | 9.00 | Concrete barrier wall for culvert extensions closed southbound shoulder |
7 | Calhoun | 167 | 030 | 5.00 | 6.00 | Width Restriction Only | 05/24/2017 | Ongoing | 24 hours | 12.00 | FT | | 9.00 | Leveling operations closed shoulders. |
7 | Calhoun | 167 | 040 | 1.00 | 5.00 | Width Restriction Only | 04/11/2018 | ongoing | 24 | 9.00 | FT | | 9.00 | Notch |
9 | Carroll | 187 | 010 | 6.05 | 6.31 | All | 10/02/2018 | Ongoing | 24 Hours | | FT | | | Closing to perform required maintenance on Beaver Dam. |
4 | Washington | 244 | 020 | 1.30 | 1.60 | Alternating East & West Bound | 10/22/2018 | Ongoing | 24 Hours | 12.00 | FT | 19.00 | 10.00 | Routine bridge maintenance. Temporary signals in use. |
4 | Washington | 265 | 020 | 10.48 | 11.04 | North & South Bound | 11/09/2018 | ONGOING | 24 | 10.00 | FT | | 10.00 | Width Restriction - All Lanes. Job 012007 |
6 | Pulaski | 338 | 010 | 3.60 | 3.80 | East Bound Outside | 03/21/2019 | 2 | 9 A.M. - 3 P.M. | | FT | | 12.00 | ATT lane closure to access manhole in Eastbound Outside Lane |
6 | Pulaski | 430 | 210 | 1.30 | 2.30 | Alternating North & South Bound | 10/18/2018 | Ongoing | 8 pm- 6 am | 12.00 | FT | | 12.00 | Job BB0618; Alternating single and double lane closures on I-430 NB |
Dist. | County | Route | Section | Begin Mile Marker | End Mile Marker | Lane(s) Closed | Begin Date | Approx. Days | Time | Hor. Clr. | Unit | Vert. Clr. | Max. Width Load | Comments................ |
6 | Pulaski | 430 | 210 | 1.53 | 2.03 | South Bound Center & Inside | 09/16/2018 | Ongoing | 10: p.m. - 5 a.m. | 12.00 | FT | | 12.00 | Job BB0618 Median and bridge work at I-430 |
6 | Pulaski | 430 | 210 | 1.53 | 2.03 | North Bound Center & Inside | 09/16/2018 | Ongoing | 10 p.m. - 5 a.m. | 12.00 | FT | | 12.00 | Job BB0618 Median and bridge work at Rodney Parham Intchg. |
6 | Pulaski | 430 | 210 | 1.53 | 2.03 | North Bound Inside | 09/16/2018 | Ongoing | 8 p.m. - 6 a.m. | 12.00 | FT | | 12.00 | Job BB0618 Median and bridge work at I-430 |
6 | Pulaski | 430 | 210 | 1.53 | 2.03 | South Bound Inside | 09/16/2018 | Ongoing | 8 p.m. - 6 a.m. | 12.00 | FT | | 12.00 | Job BB0618 Median and bridge work at I-430 |
2 | Jefferson | 530 | 050 | 35.00 | 41.00 | North & South Bound | 11/28/2017 | Ongoing | 24 Hours | | FT | | 12.00 | Crossover-both directions on Southbound side. Median and Outside Shoulder Work. Job BB0203 |
6 | Pulaski | 630 | 210 | 4.00 | 7.00 | East & West Bound | 07/16/2018 | Ongoing | 8 p.m. - 6 a.m. | | FT | | | Job CA0608. Nightly and Saturday EB and WB double lane closures during off-peak hours. |